Installed solar power generation system - メーカー・企業と製品の一覧

Installed solar power generation systemの製品一覧

1~2 件を表示 / 全 2 件

表示件数

[Aozora Electric Power PPA Implementation Case] No maintenance costs and no repair cost risks!

Thanks to self-consumption, Flair Original Co., Ltd. is able to experience a reduction in electricity costs.

We would like to introduce a case where Flair Original Co., Ltd. implemented the Aozora Electric PPA solar power generation. Initially, we proposed both a roof leasing business and the Aozora Electric business. After calculating the profits, both options were profitable, so there was some hesitation. However, since they were going to introduce solar power, they decided to consume it themselves and chose the Aozora Electric business. 【Case Study】 ■Implementation Date: February 2020 ■Location: Sakaki Town, Nagano Prefecture *For more details on the case, please visit our website. Sun Junior Website - https://www.sunjunior.co.jp/ For more information, please feel free to contact us.

  • Solar power generation equipment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[PPA Solar Power Introduction Case] Improved demand values with peak cutting!

We felt that Shin-Etsu Food Industry Co., Ltd. is contributing to the community and the environment through CO2 reduction and local production and consumption of electricity.

We would like to introduce a case study of Shin-Etsu Food Industry Co., Ltd. implementing a solar power PPA with Aozora Electric. The company decided to install demand devices and began to consider reducing electricity costs. They made efforts such as introducing energy-efficient refrigerators and turning the power on and off according to electricity peaks, but felt they had reached their limits when they saw an article about Aozora Electric in a newspaper advertisement. With Aozora Electric, they could reduce purchased electricity by consuming the electricity generated themselves, and also improve demand values through peak cutting. They decided to implement it, believing that Aozora Electric was the only option to lower their demand peak. [Case Study] - Implementation Date: July 2019 - Location: Nagano City, Nagano Prefecture *Detailed information about the case study can be viewed on our company website. Sunjunior HP - https://www.sunjunior.co.jp/ For more details, please feel free to contact us.

  • Solar power generation equipment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録